    • Nanaimo Port Authority - Provide access, containment of media and contaminants, ultra-high waterjet and coat sheet-plilings and dolphins at federal port facility (2009).
       
    • BC Ferries Heriot Bay Ferry Terminal - Containment, ultra-high waterjet SSPLWT 3 and recoat poontoon, wingwalls. (2009)
       
    • Western Forest Products - Containment, ultra-high waterjet, prime and topcoat dryland sort crane. (2009)
       
    • BC Ferries Central Island Crofton Ferry Terminal - Containment, ultra-high waterjet SSPLWT 3 and coat ramp, poontoon, apron, pilings. Apply bimagrip to apron surface. (2009)
       
    • BC Ferries Central Island Nanaimo Harbour - Containment, ultra-high waterjet, coat ramp, apron, wingwalls, pontoon. (2008)
       
    • Brookfield Power Penstocks - asbestos abatement/encapsolation. (2007)
       
    • BC Ferries Earls Cove Terminal - Refurbish ramp and apron. (2006)
       
    • Supply equipment and work force for maintenance paint project in #10 & #11 Paper Machine in Powell River's Catalyst Paper Mill (October – November 2002)
       
    • Hoard sandblast, epoxy prime and urethane paint sandfilters for Catalyst Powell River (2002).
       
    • On site sandblasting and epoxy painting of new structural steel for Lafarge Canada. Project consisted of coordinating with engineering and construction teams as a new aggregate plant was constructed and assembled (June200l - April 2002).
       
    • Exterior restoration and coating of the GI & G5 buildings for Pacifica Papers in Powell River. The project entailed sandblasting exposed rebar, concrete repair/parging of damaged exterior and applying two coats of electrometric paint (2000)
       
    • Berth sandblasting and painting for BC Ferries Corp. on Hornby Island, BC. The project involved the sandblasting and complete containment of the media and contaminants of the ferry berth (1999).
       
    • Stillwater Tower, Powell River. The removal of the MacMillan/Bloedel logo from both sides of the tower. The project entailed the use of swing staging, fall arrest, etc. in a remote environment.

 